Residual Decontaminant Degasser Purification Unit

Back to the list
Tooltip changed
0.5.6-beta (Expert)Residual Decontaminant Degasser Purification Unit
Residual Decontaminant Degasser Purification Unit
The penultimate step of water purification, step seven, consists of a series of irregular complex processes,
aimed at removing any residues of decontaminants that may linger from the previous steps,
based on the materials detected in the water by the degasser, it will request various materials to complete the above processes.
⭐ Purify Level: 7
- Running Requirements
৹ To successfully complete the recipe, materials must be inputted as required.
৹ At the operation start, the degassing control chamber will output a redstone signal, and the machine will consume all input materials every second.
৹ The redstone signal corresponds to the demand.
- Signal Requirement
৹ 1, 3, 5, 7, 9: Ozone aeration via Inert Gases
# Which is 10,000mB Helium / 8,000mB Neon / 6,000mB Argon / 4,000mB Krypton / 2,000mB Xenon
৹ 2, 4, 6, 8, 10: Superconductive deionization
# Needs input of 1,000mB of liquid superconductors corresponding to IV, LuV, ZPM, UV, UHV.
৹ 11, 13, 15: Gravitational Differential Vacuum Extraction
# Requires input of 2,000mB Liquid Amprosiums.
৹ 12, 14: Seldenian precipitation process
# Do not input anything.
৹ 0: Machine overload
# In rare situations, the machine may overload and not output any control signals.
# To prevent machine damage, input 10,000mB Liquid Helium.
✘ Any liquid not requested by the input signal will always cause the recipe to fail.
Structure From: GregTech: New Horizon
- Recipes Type : Water Purification Plant
0.6.0-dev19 (Normal)Residual Decontaminant Degasser Purification Unit
Residual Decontaminant Degasser Purification Unit
Structure From: GregTech: New Horizon
Purify Level: 7
Running Requirements
To successfully complete the recipe, materials must be inputted
as required.
At the operation start, the degassing control chamber will output
a redstone signal, and the machine will consume all input
materials every second.
The redstone signal corresponds to the demand.
Signal Requirement
1, 3, 5, 7, 9: Ozone aeration via Inert Gases
Which is 10,000mB Helium / 8,000mB Neon / 6,000mB Argon /
4,000mB Krypton / 2,000mB Xenon
2, 4, 6, 8, 10: Superconductive deionization
Needs input of 1,000mB of liquid superconductors corresponding
to IV, LuV, ZPM, UV, UHV.
11, 13, 15: Gravitational Differential Vacuum Extraction
Requires input of 2,000mB Liquid Amprosiums.
12, 14: Seldenian precipitation process
Do not input anything.
0: Machine overload
In rare situations, the machine may overload and not output any
control signals.
To prevent machine damage, input 10,000mB Liquid Helium.
Any liquid not requested by the input signal will always cause the
recipe to fail.
Recipe Type: Water Purification Plant
The penultimate step of water purification, step seven, consists of a
series of irregular complex processes,
aimed at removing any residues of decontaminants that may linger
from the previous steps,
based on the materials detected in the water by the degasser, it will
request various materials to complete the above processes.
Line only in 0.5.6-beta (Expert) Line only in 0.6.0-dev19 (Normal)