Brass Turbine Rotor
gtceu:brass_turbine_rotor, from GregTech
49 recipes use this.
- HV
- Duration
- 46 s
- Total
- 441,600 EU
- Usage
- 480 EU/t
Conditions and notes- Half-reaction charge: -2
- Electrolyte system: Aqueous
- HV
- Duration
- 442.8 s
- Total
- 4,250,880 EU
- Usage
- 480 EU/t
Conditions and notes- Half-reaction charge: -2
- Electrolyte system: Aqueous
- HV
- Duration
- 98.8 s
- Total
- 948,480 EU
- Usage
- 480 EU/t
Conditions and notes- Half-reaction charge: -2
- Electrolyte system: Aqueous
- HV
- Duration
- 103.6 s
- Total
- 994,560 EU
- Usage
- 480 EU/t
Conditions and notes- Half-reaction charge: -2
- Electrolyte system: Aqueous
- HV
- Duration
- 86 s
- Total
- 825,600 EU
- Usage
- 480 EU/t
Conditions and notes- Half-reaction charge: -2
- Electrolyte system: Aqueous
- HV
- Duration
- 66.8 s
- Total
- 641,280 EU
- Usage
- 480 EU/t
Conditions and notes- Half-reaction charge: -2
- Electrolyte system: Aqueous
- HV
- Duration
- 71.6 s
- Total
- 687,360 EU
- Usage
- 480 EU/t
Conditions and notes- Half-reaction charge: -2
- Electrolyte system: Aqueous
- HV
- Duration
- 130.8 s
- Total
- 1,255,680 EU
- Usage
- 480 EU/t
Conditions and notes- Half-reaction charge: -2
- Electrolyte system: Ionic Liquid
- HV
- Duration
- 154.8 s
- Total
- 1,486,080 EU
- Usage
- 480 EU/t
Conditions and notes- Half-reaction charge: -2
- Electrolyte system: Ionic Liquid
- HV
- Duration
- 90 s
- Total
- 864,000 EU
- Usage
- 480 EU/t
Conditions and notes- Half-reaction charge: -2
- Electrolyte system: Aqueous
- HV
- Duration
- 103.6 s
- Total
- 994,560 EU
- Usage
- 480 EU/t
Conditions and notes- Half-reaction charge: -2
- Electrolyte system: Aqueous
- HV
- Duration
- 128.4 s
- Total
- 1,232,640 EU
- Usage
- 480 EU/t
Conditions and notes- Half-reaction charge: -2
- Electrolyte system: Aqueous