Double Amprosium Plate

54 recipes use this.

  • Rotor PlatingMakes Amprosium CoatedAluminium Turbine RotorView recipe
    HV
    Duration
    428 s
    Total
    4,108,800 EU
    Usage
    480 EU/t
    Conditions and notes
    • Half-reaction charge: -2
    • Electrolyte system: Aqueous
  • Assembly LineMakes Infinite Cell ComponentView recipe
    UHV
    Duration
    120 s
    Total
    4,718,592,000 EU
    Usage
    1,966,080 EU/t
    Conditions and notes
    • Requires Research
  • AssemblerMakes Residual Decontaminant Degasser Purification UnitView recipe
    UV
    Duration
    20 s
    Total
    209,715,200 EU
    Usage
    524,288 EU/t
  • Forming PressMakes Amprosium Turbine BladeView recipe
    EV
    Duration
    417.6 s
    Total
    16,035,840 EU
    Usage
    1,920 EU/t
  • Liquefaction FurnaceMakes Liquid AmprosiumView recipe
    HV
    Duration
    52.2 s
    Total
    501,120 EU
    Usage
    480 EU/t
    Conditions and notes
    • Temp: 6,726K
    • Coil: Naquadah
  • Precision AssemblerMakes Bedrock DrillView recipe
    UV
    Duration
    80 s
    Total
    786,432,000 EU
    Usage
    491,520 EU/t
    Conditions and notes
    • Requires Absolute Clean
  • Rotor PlatingMakes Amprosium CoatedBismuth Bronze Turbine RotorView recipe
    HV
    Duration
    454.4 s
    Total
    4,362,240 EU
    Usage
    480 EU/t
    Conditions and notes
    • Half-reaction charge: -2
    • Electrolyte system: Aqueous
  • Assembly LineMakes Life ForgeView recipe
    UIV
    Duration
    40 s
    Total
    13,421,772,000 EU
    Usage
    16,777,215 EU/t
    Conditions and notes
  • AssemblerMakes Ultimate Voltage Solar PanelView recipe
    UV
    Duration
    60 s
    Total
    589,824,000 EU
    Usage
    491,520 EU/t
  • Rotor PlatingMakes Amprosium CoatedBlack Bronze Turbine RotorView recipe
    HV
    Duration
    456.8 s
    Total
    4,385,280 EU
    Usage
    480 EU/t
    Conditions and notes
    • Half-reaction charge: -2
    • Electrolyte system: Aqueous
  • Assembly LineMakes Neutron VortexView recipe
    UHV
    Duration
    80 s
    Total
    3,355,443,200 EU
    Usage
    2,097,152 EU/t
    Conditions and notes
  • Rotor PlatingMakes Amprosium CoatedBrass Turbine RotorView recipe
    HV
    Duration
    442.8 s
    Total
    4,250,880 EU
    Usage
    480 EU/t
    Conditions and notes
    • Half-reaction charge: -2
    • Electrolyte system: Aqueous
5 pages · page
Next